[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[tlaplus] Re: Deferring verification of temporal properties



In addition, I enabled this feature in the toolbox and generated the corresponding MC.cfg and MC.tla files, but they are identical to those generated before enabling this option.


Isaac DeFrain


On Fri, Feb 12, 2021 at 4:13 PM Isaac DeFrain <isaacdefrain@xxxxxxxxx> wrote:
Hello TLA+ community,

I read here (https://tla.msr-inria.inria.fr/tlatoolbox/doc/model/tlc-options-page.html#parameters) that it is possible to defer verification of temporal properties to the end of model checking. That's great news! I found here (https://github.com/tlaplus/tlaplus/issues/43) that there's an option in the toolbox. This is a good start.

I'd really like to use this feature from the command line because I much prefer to run TLC on a remote server which I ssh into, but I'm not seeing how this is possible. Is this possible?

Thank you in advance!


Best,

Isaac DeFrain

--
You received this message because you are subscribed to the Google Groups "tlaplus" group.
To unsubscribe from this group and stop receiving emails from it, send an email to tlaplus+unsubscribe@xxxxxxxxxxxxxxxx.
To view this discussion on the web visit https://groups.google.com/d/msgid/tlaplus/CAM3xQxG4OiMQwe54%3DpDnfu%2BW3hCNMFBDO3rEQ9BYFVsnmwm%2Bzg%40mail.gmail.com.